Concrete calculator

Get cubic yards, bag counts and order sizes with a waste allowance.

Concrete needed
Example result
1.36 yd³
Result details

1.5 yd³ ready-mix or 62 bags.

Before waste
1.23 yd³
Waste allowance
0.12 yd³
Bags to buy
62 × 80 lb
Ready-mix order
1.5 yd³
Estimates only.

Your inputs

Pour shape
ft
ft
in
More options
%
$
$/yd³

What-if compare

Change a second scenario and see the results side by side.

What it’s made of

Concrete before waste 90.9%Allowance 9.1%

How it’s worked out

See how we got 1.36 yd³

Volume = base area × depth × count. Order volume = volume × (1 + waste%). One cubic yard is 27 cubic feet.

  1. Multiply the rectangular area by depth for 33.33 ft³ across all pours.
  2. Add 10% waste for 1.36 yd³.
  3. Round each purchase quantity upward: 62 bags or 1.5 yd³ of ready-mix.

About this calculator

Choose the shape that matches your pour. For a rectangular slab or footing, enter the length, width and thickness. For a round slab or column, use the diameter and depth. You can multiply the result by the number of identical pours and adjust the waste allowance to account for your site conditions.

The base volume tells you what the dimensions require. The order estimate includes the added allowance, and the bag count depends on the yield you select. Check the actual yield on the bag or confirm order sizes with your supplier before buying materials.

Worked example

Concrete needed · 1.36 yd³

Volume = base area × depth × count. Order volume = volume × (1 + waste%). One cubic yard is 27 cubic feet.

  1. Multiply the rectangular area by depth for 33.33 ft³ across all pours.
  2. Add 10% waste for 1.36 yd³.
  3. Round each purchase quantity upward: 62 bags or 1.5 yd³ of ready-mix.

Common questions

How many cubic feet are in a yard?

There are 27 cubic feet in one cubic yard.

How do I allow for waste?

Use More options to change the allowance for spill and uneven ground.

Do these measurements size a footing?

Enter dimensions from the project plan. This tool estimates volume for those dimensions.

Sources and assumptions

Bag yields depend on product and bag size. Ready-mix is rounded to quarter units as a planning estimate.